[PROJECTS]

Disaster Recovery Funding Arrangements (DRFA) –
Rathdowney and Boonah Beaudesert Road

Client

Department of Transport and Main Roads

Location

Gold Coast, Tamborine, Beaudesert, Queensland

Value

$54m

Duration

June 2022 – Ongoing

Status

CURRENT

SEE Civil was awarded another Disaster Recovery Funding Arrangements (DRFA) contract for the Department of Transport and Main Roads (TMR) South Coast under a cost reimbursable model. These works were awarded exclusively under a preferred contractor arrangement.

Early Tender Involvement and award resulted from SEE Civils’ excellent relationship with DTMR and performance on the First Response Emergency Works (FREW) Tamborine Mountain Road project. The works are spread across multiple sites and are scheduled to be completed within 12 months.

The purpose of this project is reconstruction works for an assortment of sites across the South Coast network following natural disaster damage associated with the 2022 DRFA event.

 

The site locations are spread out across the following locations:

  • Mount Lindsay Highway – Rathdowney
  • Beaudesert – Boonah Rd – Beaudesert
  • Tamborine Mountain Rd – Tamborine
  • Currumbin Creek Rd – Currumbin and Tomewin
  • Nerang Murwillumbah Road
  • Rosewood – Warrill View

 

The specific work involves culvert and headwall replacement, embankment and pavement repairs, sealing and asphalting, slope stability utilising soil nails and gabion baskets, and scour protection.

All sites require traffic design and guidance scheme development, flora and fauna inspections and community notification periods prior to construction works.

Project Scope

Detailed Design
  • Design development undertaken by BG&E in parallel to construction activities. Constructability review undertaken of the preliminary designs to provide best for project outcomes.
  • Prepare detailed cost estimates for the final design packages to inform TMR of the project forecasted costs.
Construction:
  • Implementation of traffic control devices in accordance with the traffic management plan, traffic design and traffic guidance scheme documentation. Including vehicle management signs, concrete and water-filled barriers, and warning and guidance signage.
  • Investigating, relocating and protecting of existing services.
  • Implementing permits to work to manage services. Providing overhead and warning signs for electrical, identifying and relocating Telstra services.
  • Removal of unsuitable materials, establishing a suitable foundation with the designer’s approval prior to installing new embankment earth fill or rockfill.
  • Demolish and reinstate stormwater pipes, RCBC and end structures.
  • Removal of loose debris on the downslope and construction of a geotechnical stabilising solution with a combination of soil nails and gabion baskets.

Key Construction Elements

Geotechnical Works
  • Soil nails
  • Rock protection
  • Gabion basket retaining wall
  • Shotcrete protection
Civil Works
  • Demolition works to existing structures, pavements and services.
  • Clearing and grubbing.
  • General and detailed earthworks.
  • Pavements
    • Unbound gravel pavements (sub and basecourse).
    • Bituminous surfacing.
    • Pavement marking.
  • Community consultation.
  • Stormwater drainage (new and existing).
  • Public utility works including communications relocation and commissioning (Telstra).
  • General concrete (concrete lined drain and stormwater pits).
  • Guardrail.
  • Landscaping.
  • Repairs to local roads (minor sites).