Foxwell Road Infrastructure Roadworks

Client

Scentre Group

Location

Coomera, Queensland

Value

$29.9m

Timeframe

August 2017 – December 2018

Status

Complete

As part of the Coomera Town Centre Master Planned Area, SEE Civil undertook road improvement works on Foxwell Road at Coomera. Works included widening a section of Foxwell Road, improvements to nearby local roads, and constructing a new local road. The works were being undertaken adjacent to the Westfield Coomera construction site on both sides of Foxwell Road to provide additional capacity around the new shopping centre.

Project Scope

The scope included the upgrade of the existing road:

  • widening of 750 metres of Foxwell Road to two lanes in each direction, between Railway Road and the Old Pacific Highway
  • widening of approximately 640 metres of Railway Road
  • construction of a left-turning lane from Railway Road to Foxwell Road, including reclaiming and providing earth retaining for a portion of the existing Queensland Rail carpark
  • construction of a new local road (Creek Road) providing additional access from Foxwell Road to the new Westfield Coomera shopping centre
  • service relocation works including gas, sewer, communications, water and high-voltage power
  • extension of a 7-cell culvert to facilitate road widening
  • installation of new drainage infrastructure, diagonally across the Railway and Foxwell Roads intersection
  • complex traffic staging and switches to accommodate construction activities
  • liaison with stakeholders including the shopping centre developer, Queensland Rail, Gold Coast City Council and utility providers.
Key construction elements

  • Significant service relocation of high voltage electricity, sewer, water, Telstra, NBN and AARnet that involved extensive collaboration and management of stakeholders.
  • Construction of a 7-cell x 3.2m high box culvert.
  • Full widening and re-build of pavement for Foxwell Road (40,000vpd) maintaining full traffic flow at all times.
  • Removal of 13,000m3 of unsuitable material and back fill of redundant creek.
  • Full scope of works, service relocations, embankment construction, stormwater install, bound and unbound pavement.

Work With Us.

Mountain

WE PRIDE OURSELVES ON THE KNOWLEDGE, SKILLS AND EXPERIENCE OF OUR PEOPLE.

 

SEE Group builds teams and workplaces where everyone can be their best.