[PROJECTS]
Wave 2 represented a significant milestone in the Pacific Highway Upgrade Woolgoolga to Ballina (W2B) project. SEE Civil was awarded the inaugural package, focusing on critical early works covering a 3.8 km segment.
This phase encompassed several essential components, such as foundational treatment for soft soil, the implementation of an advanced stormwater drainage system, wick drain installation, geotechnical instrumentation, the use of high-strength geosynthetic materials, and the construction of embankment fill in a flood-prone area.
Notably, this phase also included temporary pavement improvements, which not only enhanced the existing intersection but also introduced new gate access points along the Pacific Highway alignment.