Surfers Paradise
Sand Backpass Pipeline

Client

Gold Coast City Council

Location

Surfers Paradise, Queensland

Value

$6.3M

Duration

May 2021 – June 2022

Status

Complete

The Surfers Paradise Sand Backpass Pipeline (the Pipeline) recycles and delivers natural sand from The Spit to Surfers Paradise to buffer against future storms and coastal erosion.

The Pipeline was completed over 2 stages and consisted of 7.8 kilometres of permanent underground 450 dia HDPE pipe and temporary above ground pipe.

Stage 2 of the works was 5.8km in total, starting at the Sand Backpass Pumping Station and joining onto Stage 1 works at Narrowneck Beach, Surfers Paradise.

Project Scope

  • Supply of all pre-construction documentation
  • Site establishment – temporary fencing to establish the site boundaries and contractor compound
  • Dilapidation report
  • Location of services
  • Directional drilling
  • Piling works
  • Concrete works
  • Structural works
  • Traffic and pedestrian management
  • Decommissioning, demolition, removal, clearing and disposal works
  • Setting out and levelling operations
  • Excavation and trenching works
  • Roadworks and asphalt reinstatement
  • Testing and commissioning of all installations.
Key Construction Elements

  • Working together with various stakeholders through different stages of the project.
  • Working in sand and interactions with public and traffic.
  • Demolition and addition to part of existing structure on a working building.
  • Management of traffic and public around works area which included:
    • 2.6km of roadway at Seaworld Drive, Main Beach.
    • Management of public whilst working at parks and beaches at Main Beach.
  • Directional drilling at key locations to minimise disturbance to critical areas.